Water Main Under the RR Tracks

The steel casing under the railroad tracks was completed yesterday. The contractor is going to work tomorrow (Saturday) to install the plastic water main pipe through the casing. All work done tomorrow will be at the RR Tracks, within the contractors fencing. The total length is almost 300 feet. The water main pipe that is installed through this casing will be connected to the rest of the pipe that is being installed by HDD (see post below from April 21…)